Black Langur is a retreat centre in the forests of Wayanad. Its foundations went in beside living trees, with no excavated pits and no felling. A jackfruit tree still stands next to the building.

Sq ft retreat centre
25,000
Trees cut
0
PEN points
200+
Less settlement at 306 kN/m²
81%
Test load carried
2.2×

The trees were there first. The building had to find its place between them.

Black Langur sits in Kalpetta, Wayanad, on land that is still forest: tall areca palms, old hardwoods, coffee and pepper growing in their shade. The brief was a 25,000 sq ft retreat centre. The condition was that the forest stays.

On most sites, that condition fails at the foundation. A conventional footing needs a pit for every column. Each pit is dug wider than the footing, roots in the way are cut, spoil is piled on the ground around it, and concrete cures for weeks. Near a tree, that is how the tree is lost, even when nobody plans to fell it.

So the foundation had to be one that could stand next to a trunk without digging under it.

The constraint

A forest site, and a promise to keep it

The architects drew the plan around the trees. On the Cluster-1 foundation plan, two trees are drawn in at the entrance foyer and the verandah, each with a cutout in the floor so it can keep growing through the building.

Cluster-1 foundation plan showing two existing trees with floor cutouts and PEN foundations placed beside them
From the Cluster-1 foundation plan. Two trees kept inside the building, each with a cutout. PEN foundations (blue labels) sit right beside them.

Drawing a tree into a plan is the easy part. Keeping it alive through construction is not. Every point near a trunk had to be a point that needed no pit.

No pits beside the trunks. No roots cut. No trees felled.

The brief, in three lines
The PEN solution

Nails, not pits

PEN Foundation is a patented, zero-excavation foundation. A precast node sits at ground level and four galvanised steel nails, tipped with tungsten carbide, are driven through it into the soil at a batter, then grouted. The nails spread load into a wide volume of soil, while the footprint at the surface stays about the size of the node.

That small footprint is what made Black Langur possible. A crew can set a node within reach of a trunk, drive the nails, and leave the ground around the tree as it was. There is no curing period, so each point is ready for the plinth beam as soon as installation and checks are complete.

Crew driving PEN nails through a precast node next to a standing tree trunk, Wayanad, 3 March 2025Black Langur building under construction with trees standing beside its wallsInstallation, Mar 2025The building
Drag to compare. Left: nails going in beside a standing trunk. Right: the building, with its trees still beside the walls.

One PEN point, beside one tree.

Sequence · Black Langur
  1. 01Set outPoint marked clear of the trunk
  2. 02Place nodePrecast node set at ground level
  3. 03DriveFour nails per node, at a batter
  4. 04Grout and checkGrouted, then quality sign-off
  5. 05TiePlinth beam links the points
  6. 06BuildWalls rise, the tree stays
Cement, PEN
6%
Cement, conventional
100%
Water, PEN
4%
Water, conventional
100%
  • Worker driving a PEN nail with the node beside a tree trunk
    Driving a nail, trunk at arm's length
  • Crew installing a PEN node on a cleared Wayanad plot with trees behind
    Four nails, one node, no pit
  • Plate load test reaction truss over a test pit in the forest
    Load test set up among the trees
The proof

Tested on this soil, before the first wall

A forest site gives you soft, root-laced topsoil and little room for heavy equipment. Before construction, C-DISC commissioned plate load tests on the Black Langur soil at MatterLab, an NABL-accredited laboratory, to IS 1888:1982. One test loaded the natural soil. The other loaded the soil with PEN.

Load against settlement300 mm plate · MatterLab, NABL TC-10743 · December 2024
0510152025303540450100200300400500600700Load, kN/m²Settlement, mmWithout PEN, test endWith PEN, 667 kN/m²
With PEN 8.05 mmWithout PEN 41.96 mm
Drag the load. The natural soil test ended at 306 kN/m² with 41.96 mm settlement. With PEN, settlement at the same load was 8.05 mm, and the test continued to 667 kN/m².
  • 81% less settlementAt 306 kN/m², 8.05 mm with PEN against 41.96 mm without.
  • 2.2× the test loadThe PEN test reached 667 kN/m², against 306 kN/m² for the natural soil, and still settled less: 30.06 mm.
  • A curve that stays smoothWithout PEN, settlement jumps from 11 mm to 22 mm between 222 and 250 kN/m². With PEN, it climbs steadily all the way.
The system

A forest plan, tied together

Black Langur is laid out as clusters, staff quarters and family quarters spread through the trees. In each block, PEN points sit at column and wall junctions and a reinforced plinth beam ties them into one frame. TMT bars welded to each node top lock the PEN point into the beam, and rubber caps protect the nail heads.

  • PEN where the trees arePoints placed close to trunks and inside the cutouts, where a pit would have cut roots.
  • Plinth beams150 x 300 mm and 150 x 600 mm beams link the points in the family quarters, so the group acts together.
  • Designed per blockEach block has its own foundation plan. Where the design calls for it, conventional footings work alongside PEN in the same layout.
Watch: the building, and the trees beside itSite walk · 10 s
The result

A retreat that still looks like a forest

The building rose between its trees instead of in a clearing. Walk past it today and the trunks are still at the walls, the canopy still over the roof, and a jackfruit tree still stands next to the building it could easily have made way for.

For a retreat, that is the product. Guests come to Wayanad for the forest. Black Langur kept it.

For your project

What Black Langur means for you

Keep the view you bought the land for.

  • Build among mature trees without felling them
  • No pits, no spoil heaps, no weeks of curing
  • Less clearing means less to landscape back later
Black Langur building among trees
The evidence

Why engineers can trust a foundation without a pit

Leaving the forest standing is only useful if the building above it is safe. Every PEN project is designed for its own soil and loads. At Black Langur that meant site plate load tests, block-by-block foundation plans, and drawings a consultant can check.

  • NABL-accredited labsPlate load tests on this site's soil
  • PLAXISGeotechnical simulation studies
  • ANSYSStructural finite element analysis
  • NIT Calicut, IIT KanpurAcademic validation of the system
The bigger picture

A sustainable foundation, measured in trees

C-DISC Technologies is reinventing construction from its first point: the foundation. PEN Foundation installs in hours instead of weeks, uses 94% less cement and 96% less water than a conventional footing, and cuts carbon by over 1.5 tonnes for every 1,000 sq ft built.

Black Langur adds one more number to that list. On eco-resorts, hill sites and wooded plots, the greenest foundation may be the one that lets you keep what is already growing.

Questions

Frequently asked

  • Can you build a foundation next to a tree without cutting it?

    Yes, for suitable low-rise structures. PEN needs no footing pit, so a point can be placed close to a trunk without digging out the soil and roots around it. At Black Langur, foundations for a 25,000 sq ft retreat went in with no trees cut.

  • What is a zero-excavation foundation?

    A foundation installed from the surface with no pit. In PEN, four steel nails are driven at a batter through a precast node and grouted. There is no excavation and no curing period.

  • How strong is PEN on soft forest soil?

    On the Black Langur soil, a plate load test with PEN settled 8.05 mm at 306 kN/m², against 41.96 mm for the natural soil, and continued to 667 kN/m². Tests were done by an NABL-accredited laboratory to IS 1888:1982.

  • Is PEN suitable for resorts and eco-tourism projects?

    Yes. Cottages, villas, staff housing and clusters up to G+2 suit PEN after a review of soil, loads and site. It is well suited to wooded, sloping and sensitive sites.

  • Is PEN a sustainable foundation?

    PEN uses 94% less cement and 96% less water than a conventional footing, avoids excavation, and is GRIHA listed. On sites like Black Langur, it also means trees do not have to go.

  • Can PEN work with conventional footings?

    Yes. Each block is designed on its own, and PEN can sit in the same layout as conventional footings, tied together by plinth beams.

For engineers

Technical data sheet

The parameters behind the story, for consultants and reviewers who want to check the design.

Project record · Black LangurKalpetta, WayanadRef: FC-40/24-KPT
ProjectForest retreat centre, about 25,000 sq ft
BlocksCluster buildings, staff quarters, family quarters
FoundationPEN points; precast node with 4 battered galvanised steel nails (40 dia x 2 mm), tungsten carbide tipped, grouted
Node connectionTMT bars welded to node top, cast into plinth beam; rubber caps
Plinth beamsPB-1 150 x 300 mm; PB-2 150 x 600 mm (family quarters)
Conventional footingsF1 1200 x 1200 x 400 mm; F2 1500 x 1500 x 400 mm, where specified (Cluster-1)
Trees retainedAll; floor cutouts around trunks at foyer and verandah (Cluster-1)
Load test standardIS 1888:1982, 300 mm plate, hydraulic jack with kentledge reaction
Test laboratoryMatterLab, Kozhikode; NABL TC-10743
Natural soil41.96 mm at 306 kN/m² (test end)
Soil with PEN8.05 mm at 306 kN/m²; 30.06 mm at 667 kN/m² (test end)
InstallationFrom March 2025; no curing period
PEN validationNIT Calicut and IIT Kanpur; PLAXIS and ANSYS studies; GRIHA listed
Cluster-1 footing plan with PEN foundations, conventional footings and tree cutouts
Cluster-1 footing plan. PEN points in blue, tree cutouts at the foyer and verandah.
Family quarters plinth beam plan with eight PEN foundations
Family quarters plinth beam plan
Section through PEN foundation with plinth beam, TMT bars and battered nails
PEN point and plinth beam section

Building on land you would rather not clear?

Send us your location, drawings and soil data. Our engineers will tell you whether PEN Foundation fits, and how close to your trees it can go.

Request a Project Assessment