ALAPPUZHA, KERALA · SITE
Alappuzha, Kerala · [Year]

Backwater Eco Resort

01The challenge

Water-table-adjacent site where conventional footings would have required continuous dewatering.

02Site conditions

Alluvial soil, high water table, root zones from mature trees the client wanted preserved.

Water-rich alluvial
SOIL SECTION · SITE-SPECIFIC
PLAN DRAWING · SLEEVE LAYOUT
03Engineering approach

PEN nodes set without dewatering; root zones left undisturbed within 1.5 m of each node.

PEN — 6 point
04Installation

Installed in 1 day, 6 units.

INSTALL · 01
INSTALL · 02
TECHNICAL DRAWING
06Performance
1 day

Install duration

2.4×

Bearing capacity achieved

78%

Concrete saved

0 m³

Soil excavated

07Lessons learned

[What the team would change or what surprised them on this install.]