Skip to content
A library at night, its cylindrical reading tower lit from within

Applications

Commercial

Faster foundation completion can bring the structure and the revenue-generating asset forward, while keeping the site cleaner and reducing programme uncertainty.

Why PEN

One precast node. Four engineered nails. Ready to build.

PEN Foundation, the Pre-Engineered Nail Foundation System, is a patented, biomimetic foundation inspired by the way tree roots distribute load through soil. A high-strength precast node sits at ground level and transfers structural loads through four inclined steel nails driven into the surrounding soil. The system is designed for the project’s soil, structural loads and layout, then installed without excavation, formwork or on-site foundation curing.

  1. 01

    Zero excavation

    Soil layers, drainage paths and terrain are preserved.

  2. 02

    Installed within hours

    No on-site foundation curing cycle at the end of the sequence.

  3. 03

    Immediate load readiness

    Ready for approved superstructure connection after installation and quality checks.

  4. 04

    Less concrete and water

    Substantially lower concrete and water use than conventional RCC footings.

  5. 05

    Qualified by evidence

    Soil- and load-qualified design supported by testing, simulation and field deployment.

Process

Four steps from project enquiry to structure

PEN is specified for the project, not sold as an unqualified off-the-shelf footing. The layout, number of points and installation configuration follow from the ground and the structure.

  1. 01

    Assess

    We review the project location, structural system, column reactions, site access and available soil information. Where required, soil suitability is established through appropriate field or geotechnical inputs.

  2. 02

    Engineer

    Our engineers develop the foundation layout and configuration for the approved project loads and qualified soil conditions. Point count, position, nail geometry and embedment are selected as part of the design process.

  3. 03

    Install

    The precast nodes are positioned, the engineered nails are driven into the soil and the system is completed in accordance with the approved installation method. There is no excavation, formwork or on-site foundation curing cycle.

  4. 04

    Build

    Once installation and quality checks are completed, the superstructure can connect to the node and construction can continue without the conventional foundation waiting period.

FAQ

Questions about commercial projects

  • Why use PEN on a commercial project?

    Faster foundation completion can bring the structure and the revenue-generating asset forward, while keeping the site cleaner and reducing programme uncertainty.

  • How long does installation take?

    Around two hours per foundation point, and the point is load-bearing the moment the last nail is driven and grouted. There is no curing period, so structural work can begin the same day.

  • Is it suitable for permanent structures?

    Yes — it is carrying permanent buildings today, including a library retrofit and rehabilitation housing. The system is engineered for low-rise construction; structures above G+2 are on the development roadmap rather than in the current product. Components are also recoverable at end of life, which makes it equally suited to relocatable and temporary buildings.

  • What code governs the design?

    IS 2911 Part 4, the Indian standard for nail and pile systems — not IS 6403, which covers shallow footings. Minimum embedment is 900 mm per that code. Components reference IS 1239 for the GI pipe and IS 5624 for the bolts. A dedicated BIS standard for the system is under development.

  • Does it count towards green building credit?

    The pre-engineered nail foundation is included in the GRIHA Product Catalogue under the Innovation typology, against GRIHA V.2019 criterion 30, valid to 11 June 2027. It can be used on GRIHA-registered projects to meet that criterion — confirm your project’s own compliance requirements with GRIHA first.