
Gallery
The archive
Site photography, installation sequences, and engineering documentation from PEN Foundation deployments.
- Entries
- 10
- Categories
- 6
On site
Projects, installs and testing on site
ProjectsHillside residence · exterior
ConstructionNode cast, day 1
InstallationNail driver, 26° set
DroneSite overview, aerial
TestingLateral load rig
VideosTwo-hour install, full sequence
ProjectsBackwater resort · units 1–6
ConstructionSleeve set, cast-in
InstallationSolar array, point 140
DroneArray overview, aerial
