Skip to content
A timber-clad prefabricated cabin lifted by crane onto its base, workers guiding it into place among palm trees

Applications

Modular and prefab

A foundation process aligned with factory-made structures: fast, repeatable, precise and capable of supporting relocatable design strategies where engineered accordingly.

For modular and steel OEMs

Your building is pre‑engineered. Your foundation can be too.

PEN pairs a factory-made M50 node and galvanized steel nails with an interface designed around your building system. The opportunity is a repeatable foundation interface, not just faster foundations.

Factory speed above ground. Conventional civil work below it.

In the factoryYour structure

Fabricated, checked and ready to assemble on a known date.

On site, todayYour foundation
  1. Excavation
  2. Reinforcement
  3. Formwork
  4. Concrete
  5. Water
  6. Curing
Engineering interface

Start with the building system.

An OEM integration reviews your support conditions once, then reuses the result across models.

What the review covers

  • Support positions
  • Base geometry
  • Compression reactions
  • Uplift
  • Lateral actions
  • Connection details
  • Permissible movement
  • Building variants
  • Typical site conditions
  1. M50 precast node

    A controlled structural component.

  2. Galvanized steel nails

    Typical four-nail configuration.

  3. Engineered interface

    Bolted Variant A for steel, LGSF and prefab bases.

  4. Site-specific engineering

    A repeatable superstructure does not remove soil qualification.

Integration pathway

Engineer the interface once.

  1. 01

    Representative model

    One building type with its reactions.

  2. 02

    Interface review

    Base plate, bolts, tolerances.

  3. 03

    Pilot project

    One live site.

  4. 04

    Connection validation

    Measured on the pilot.

  5. 05

    Repeatable intake

    Standard inputs for every order.

Build a repeatable process around one good interface.

Start an OEM Integration Review
Why PEN

One precast node. Four engineered nails. Ready to build.

PEN Foundation, the Pre-Engineered Nail Foundation System, is a patented, biomimetic foundation inspired by the way tree roots distribute load through soil. A high-strength precast node sits at ground level and transfers structural loads through four inclined steel nails driven into the surrounding soil. The system is designed for the project’s soil, structural loads and layout, then installed without excavation, formwork or on-site foundation curing.

  1. 01

    Zero excavation

    Soil layers, drainage paths and terrain are preserved.

  2. 02

    Installed within hours

    No on-site foundation curing cycle at the end of the sequence.

  3. 03

    Immediate load readiness

    Ready for approved superstructure connection after installation and quality checks.

  4. 04

    Less concrete and water

    Substantially lower concrete and water use than conventional RCC footings.

  5. 05

    Qualified by evidence

    Soil- and load-qualified design supported by testing, simulation and field deployment.

Process

Four steps from project enquiry to structure

PEN is specified for the project, not sold as an unqualified off-the-shelf footing. The layout, number of points and installation configuration follow from the ground and the structure.

  1. 01

    Assess

    We review the project location, structural system, column reactions, site access and available soil information. Where required, soil suitability is established through appropriate field or geotechnical inputs.

  2. 02

    Engineer

    Our engineers develop the foundation layout and configuration for the approved project loads and qualified soil conditions. Point count, position, nail geometry and embedment are selected as part of the design process.

  3. 03

    Install

    The precast nodes are positioned, the engineered nails are driven into the soil and the system is completed in accordance with the approved installation method. There is no excavation, formwork or on-site foundation curing cycle.

  4. 04

    Build

    Once installation and quality checks are completed, the superstructure can connect to the node and construction can continue without the conventional foundation waiting period.

FAQ

Questions about modular and prefab

  • Why use PEN under modular and prefab buildings?

    A foundation process aligned with factory-made structures: fast, repeatable, precise and capable of supporting relocatable design strategies where engineered accordingly.

  • Why is it called “pre-engineered”?

    The node is cast and cured in the factory to a fixed model, CD-PEN-32.3.2.1500, and arrives ready to use — nothing is mixed, formed or cured on your site. What is engineered per project is the layout and the driving: the point count, the embedment and a batter angle set between 40° and 51° for your ground.

  • Is it suitable for permanent structures?

    Yes — it is carrying permanent buildings today, including a library retrofit and rehabilitation housing. The system is engineered for low-rise construction; structures above G+2 are on the development roadmap rather than in the current product. Components are also recoverable at end of life, which makes it equally suited to relocatable and temporary buildings.

  • How long does installation take?

    Around two hours per foundation point, and the point is load-bearing the moment the last nail is driven and grouted. There is no curing period, so structural work can begin the same day.

  • How many units will my project need?

    It depends on the structure and the ground. As a rough indication, a G+1 house typically needs 16–20 PEN units. The actual point count comes out of the engineering assessment.