Our Patented Technology

“Pre-engineered” is literal.One precast node. Four engineered nails. Ready to build.

  1. M12 galvanised boltsM12 grade 4.6 galvanised · IS 5624
  2. M50 precast nodeM50 grade precast concrete · 450 × 450 × 200 mm
  3. GI nail pipesGI pipe · 32 mm OD, 3.2 mm wall, IS 1239
  4. Tungsten carbide tipsTungsten carbide · recycled Kennametal / Sandvik grade
Enhancement Factor
2.0–2.6× SBC
Design code
IS 2911 Part 4
Min. embedment
900 mm
Peak load observed
667 kN/m²
Specification

What goes into the ground

Node
M50 grade precast concrete — 450 × 450 × 200 mm
Nail pipes
GI pipe — 32 mm OD, 3.2 mm wall, IS 1239
Nail tip
Tungsten carbide — recycled Kennametal / Sandvik grade
Batter angle
40–51° — site-adjusted
Min. embedment
900 mm — per IS 2911 Part 4
Grout
Fosroc Conbextra GP2 micro-concrete, non-shrink
Bolts
M12 grade 4.6 galvanised — IS 5624
Peak load observed
667 kN/m² — MatterLab field test, Wayanad

Model CD-PEN-32.3.2.1500 · Governed by IS 2911 Part 4 (nail / pile system)

Soil-structure interaction

Because the four nails are driven apart at a batter, they engage a three-dimensional volume of soil far larger than the node’s own footprint.

Non-shrink grout pumped down each pipe locks it to the ground along its length. That is where the measured capacity gain comes from: an Enhancement Factor of 2.0–2.6× the soil’s bearing capacity, confirmed by field plate load tests at NIT Calicut.

Estimate your project
Load transfer

Where does the capacity gain come from?

A conventional footing concentrates load beneath a concrete mass. PEN distributes load through four inclined paths that engage a three-dimensional volume of soil. The design is compact at the surface but active below it, using soil-structure interaction rather than relying only on the footprint of the node.

A timber-framed house raised on PEN nodes, their nails splayed into the ground beneath it
[ Soil-structure interaction ]

What soil conditions is it suitable for?

The system has been tested and modelled across red laterite, black cotton, sandy, rocky and waterlogged high-water-table conditions, and a PLAXIS 3D parametric study covers multiple soil types. Suitability is still decided per site — rocky ground, for example, may need a pilot bore. Your soil data is the first thing our engineers ask for.

Installation

Four steps from project enquiry to structure

PEN is specified for the project, not sold as an unqualified off-the-shelf footing. The layout, number of points and installation configuration follow from the ground and the structure.

  1. Assess

    We review the project location, structural system, column reactions, site access and available soil information. Where required, soil suitability is established through appropriate field or geotechnical inputs.

  2. Engineer

    Our engineers develop the foundation layout and configuration for the approved project loads and qualified soil conditions. Point count, position, nail geometry and embedment are selected as part of the design process.

  3. Install

    The precast nodes are positioned, the engineered nails are driven into the soil and the system is completed in accordance with the approved installation method. There is no excavation, formwork or on-site foundation curing cycle.

  4. Build

    Once installation and quality checks are completed, the superstructure can connect to the node and construction can continue without the conventional foundation waiting period.

PEN vs. conventional

PEN Foundation and a conventional footing, side by side

FeaturePEN FoundationConventional footing
Load-bearing the day it is installedYesNo
Zero excavation, no spoil to dispose ofYesNo
No wet concrete cast on siteYesNo
No water needed for installationYesNo
Installs on disturbed or sloping ground without excavationYesNo
Components recoverable at end of lifeYesNo
Designed to an Indian Standard codeYesYes
Capacity verified by on-site plate load testingYesYes
Suitable for permanent structuresYesYes

PEN is governed by IS 2911 Part 4 (nail / pile system); a conventional isolated footing by IS 6403. Both are designed to code — the difference is which one, and what the ground has to go through to get there.

Validation

Field-tested at NIT Calicut, mentored by IIT Kanpur, listed by GRIHA

  • What testing has been done?

    Field plate load tests at NIT Calicut to IS 1888:1982, field load testing by MatterLab in Wayanad, finite element analysis in ANSYS, and a PLAXIS 3D parametric study across soil types carried out as an NIT Calicut MTech thesis. IIT Kanpur mentors the programme and runs long-term monitoring.

  • What loads can it carry, and how is that verified?

    Capacity is established per project from plate load testing on your site, not quoted as a fixed number. For reference, field testing by NABL-accredited MatterLab in Wayanad recorded a peak load of 667 kN/m². Design follows IS 2911 Part 4 with a Factor of Safety of 2.5 on a single plate load test, or 2.0 where two or more tests are run.

  • What code governs the design?

    IS 2911 Part 4, the Indian standard for nail and pile systems — not IS 6403, which covers shallow footings. Minimum embedment is 900 mm per that code. Components reference IS 1239 for the GI pipe and IS 5624 for the bolts. A dedicated BIS standard for the system is under development.

  • National Institute of Technology Calicut
  • Indian Institute of Technology Kanpur
  • GRIHA Council
Project calculator

What could your project save?

Project type

12

Soil type

Traditional time
12days
PEN time
2days
Time saved
10days · 83%
CO₂-eq avoided
1.2 test.
0 m³ soil displaced

Directional estimate from published PEN assumptions (~2 h/point, 6× faster deployment, ~100 kg CO₂-eq avoided per unit). Actual figures depend on site conditions.

Indicative only — not a design or a quotation.