Skip to content
A curved-roof pavilion raised on a light frame among trees

Applications

Eco-resorts and farmstays

Zero excavation helps preserve tree roots, soil structure, slopes and the natural character guests come to experience. Earlier project completion can also bring operations and revenue forward.

Why PEN

One precast node. Four engineered nails. Ready to build.

PEN Foundation, the Pre-Engineered Nail Foundation System, is a patented, biomimetic foundation inspired by the way tree roots distribute load through soil. A high-strength precast node sits at ground level and transfers structural loads through four inclined steel nails driven into the surrounding soil. The system is designed for the project’s soil, structural loads and layout, then installed without excavation, formwork or on-site foundation curing.

  1. 01

    Zero excavation

    Soil layers, drainage paths and terrain are preserved.

  2. 02

    Installed within hours

    No on-site foundation curing cycle at the end of the sequence.

  3. 03

    Immediate load readiness

    Ready for approved superstructure connection after installation and quality checks.

  4. 04

    Less concrete and water

    Substantially lower concrete and water use than conventional RCC footings.

  5. 05

    Qualified by evidence

    Soil- and load-qualified design supported by testing, simulation and field deployment.

Process

Four steps from project enquiry to structure

PEN is specified for the project, not sold as an unqualified off-the-shelf footing. The layout, number of points and installation configuration follow from the ground and the structure.

  1. 01

    Assess

    We review the project location, structural system, column reactions, site access and available soil information. Where required, soil suitability is established through appropriate field or geotechnical inputs.

  2. 02

    Engineer

    Our engineers develop the foundation layout and configuration for the approved project loads and qualified soil conditions. Point count, position, nail geometry and embedment are selected as part of the design process.

  3. 03

    Install

    The precast nodes are positioned, the engineered nails are driven into the soil and the system is completed in accordance with the approved installation method. There is no excavation, formwork or on-site foundation curing cycle.

  4. 04

    Build

    Once installation and quality checks are completed, the superstructure can connect to the node and construction can continue without the conventional foundation waiting period.

FAQ

Questions about eco-resorts and farmstays

  • Why use PEN for an eco-resort or farmstay?

    Zero excavation helps preserve tree roots, soil structure, slopes and the natural character guests come to experience. Earlier project completion can also bring operations and revenue forward.

  • Is excavation required?

    No. Nothing is dug out. The node sits on the surface and the nails are driven, so soil stratification, groundwater flow and aquifer recharge are left intact — and the 2–3 m³ of spoil a conventional point generates never has to be disposed of.

  • Does the site need water or heavy plant?

    Installation is a dry process — no water is used and no concrete is cast on site, so nothing has to be trucked in for the foundation itself. That is a large part of why the system suits remote and access-restricted sites.

  • What soil conditions is it suitable for?

    The system has been tested and modelled across red laterite, black cotton, sandy, rocky and waterlogged high-water-table conditions, and a PLAXIS 3D parametric study covers multiple soil types. Suitability is still decided per site — rocky ground, for example, may need a pilot bore. Your soil data is the first thing our engineers ask for.

  • Does it count towards green building credit?

    The pre-engineered nail foundation is included in the GRIHA Product Catalogue under the Innovation typology, against GRIHA V.2019 criterion 30, valid to 11 June 2027. It can be used on GRIHA-registered projects to meet that criterion — confirm your project’s own compliance requirements with GRIHA first.